PREPARATION FOR ARRIVAL TO PORT   Leave a comment







* In preparing the passage for arrival in port, has the pre-pilotage information exchange taken place?





* Has the passage plan been updated following receipt of the shore to ship Pilot/Master Exchange form and all latest navigational warnings?



* Has the ETA been sent with all relevant information required by local regulations?



* Is it necessary to rearrange cargo ballast?



* Has the following equipment been prepared and checked?



Course and engine movement records

Clock synchronisation

Communications with the E/R control and mooring stations

Signalling equipment, including:

Flags

Lights

Deck lighting

Mooring winches and lines including heaving lines

Pressure on fire main

Anchors cleared away

Stabiliers and log tubes housed

Has the steering gear been tested, and has manual steering been engaged in sufficient time for the helmsman to become accostumed before manoeuvring commences?

Have the engines been tested and prepared for manoeuvring?

Has the Pilot Card been completed and are the Pilot embarkation arrangements?

Have VHF channels for the various services been noted and radio check carried out?

VTS

Pilot

Tugs

Berthing instructions

Agent

Others

Has the Port been made fully aware of any special berthing requirements that the ship may have?

Other check.

Publicado 19 de febrero de 2010 por leibermendoza en PROCEDIMIENTOS

Responder

Introduce tus datos o haz clic en un icono para iniciar sesión:

Logo de WordPress.com

Estás comentando usando tu cuenta de WordPress.com. Cerrar sesión / Cambiar )

Imagen de Twitter

Estás comentando usando tu cuenta de Twitter. Cerrar sesión / Cambiar )

Foto de Facebook

Estás comentando usando tu cuenta de Facebook. Cerrar sesión / Cambiar )

Google+ photo

Estás comentando usando tu cuenta de Google+. Cerrar sesión / Cambiar )

Conectando a %s

A %d blogueros les gusta esto: